KEY TRENDS • At the national level, the proportion of government schools having facilities like drinking water was 96.39 percent, boys' toilet was 94.64 percent, girls' toilet was 97.03 percent, boundary wall was 60.12 percent, playground was 56.98 percent, ramp was 71.50 percent, CWSN toilet was 19.59 percent, electricity was 56.45 percent and library was 79.36 percent, according to the Unified District Information System For Education (UDISE) 2017-18 (Provisional) *12 • ASER 2019 ‘Early Years’ data shows a clear...
More »SEARCH RESULT
Migration
KEY TRENDS • The new Cohort-based Migration Metric (CMM) shows that inter-state labor mobility averaged 5-6.5 million people between 2001 and 2011, yielding an inter-state migrant population of about 60 million and an inter-district migration as high as 80 million @* • The first-ever estimates of internal work-related migration using railways data for the period 2011-2016 indicate an annual average flow of close to 9 million migrant people between the states. Both these estimates are significantly greater than the...
More »Right to Education
KEY TRENDS • A survey study by CRY across 71 districts in 13 states during September-October 2012 to assess the implementation of RTE reveals that: a. 11% schools did not have toilets; b. Only 18% schools had separate toilets for girls; c. In 34% schools toilets were observed to be in bad condition or unusable; d. 20% schools did not have safe drinking water; e. 12% schools had a tap, or...
More »Mid Day Meal Scheme (MDMS)
KEY TRENDS • The biggest school feeding programmes are in India (114 million), Brazil (47 million), the United States (45 million) and China (26 million). India has a universal school meals programmes. It's school feeding programme ranks 12th among 35 lower-middle-income countries covering 79 percent of its total number of school-going children $ • In 2010-11, the combined expenditure of the central government and the state governments/ Union Territories on the school meals...
More »Disaster & Relief
KEY TRENDS • In 8 out of 17 states/ UTs the flood management works were not taken up in an integrated manner covering entire river/ tributary or a major segment of rivers/ tributaries and the Preliminary Project Reports/ Detailed Project Reports (DPRs) were not prepared in accordance with the scheme guidelines. There were huge delays in completion of FMP works which ranged from 10 months to 13 years due to delay...
More »