KEY TRENDS • As per the 2019 Global Hunger Index report, neighbouring countries such as China (GHI score: 6.5; GHI rank: 25), Sri Lanka (GHI score: 17.1; GHI rank: 66), Myanmar (GHI score: 19.8; GHI rank: 69), Nepal (GHI score: 20.8; GHI rank: 73), Bangladesh (GHI score: 25.8; GHI rank: 88) and Pakistan (GHI score: 28.5; GHI rank: 94) have outperformed India (GHI score: 30.3; GHI rank: 102) *13 • As per the 2018 Global Hunger Index report,...
More »SEARCH RESULT
Key Facts
Output and Growth According to the [inside]Economic Survey 2017-18, Volume-2[/inside] (please click here to access): • The growth rates of agriculture & allied sectors have been fluctuating at 1.5 per cent in 2012-13, 5.6 per cent in 2013-14, (-) 0.2 per cent in 2014-15, 0.7 per cent in 2015-16 and 4.9 per cent in 2016-17. • The Gross Capital Formation (GCF) in Agriculture and Allied Sectors relative to Gross Value Added (GVA) in...
More »Migration
KEY TRENDS • The new Cohort-based Migration Metric (CMM) shows that inter-state labor mobility averaged 5-6.5 million people between 2001 and 2011, yielding an inter-state migrant population of about 60 million and an inter-district migration as high as 80 million @* • The first-ever estimates of internal work-related migration using railways data for the period 2011-2016 indicate an annual average flow of close to 9 million migrant people between the states. Both these estimates are significantly greater than the...
More »Forest and Tribal Rights
KEY TRENDS • As per the information collected by the Ministry of Tribal Affairs (MoTA) upto 31 October, 2017, 41,89,827 claims (40,50,131 individual and 1,39,696 community claims) have been filed and 18,24,271 titles (17,59,955 individual and 64,316 community claims) have been distributed. A total of 36,51,414 (87.15 percent) claims have been disposed off @@ • In the last 10 years, only 3 percent of the minimum potential of CFR rights could be...
More »Disaster & Relief
KEY TRENDS • In 8 out of 17 states/ UTs the flood management works were not taken up in an integrated manner covering entire river/ tributary or a major segment of rivers/ tributaries and the Preliminary Project Reports/ Detailed Project Reports (DPRs) were not prepared in accordance with the scheme guidelines. There were huge delays in completion of FMP works which ranged from 10 months to 13 years due to delay...
More »